Back

Investment Model for Renewable Electricity Systems (IMRES): an Electricity Generation Capacity Expansion Formulation with Unit Commitment Constraints

Fernando J. de Sisternes

November 2013

Fernando J. de Sisternes 

This paper describes the formulation of IMRES: an electricity generation capacity expansion model with unit commitment constraints in which decisions pertaining to investment, unit commitment and energy dispatch are taken jointly. The purpose of this model is to determine the minimum cost electricity generation capacity mix in systems with a high penetration of intermittent renewable energy resources, while accounting for the operational dynamics of thermal units and their impact on total system cost. The model is formulated as a 0-1 MILP, taking capacity decisions at the individual power plant level, and accounting for techno-economic considerations such as ramp constraints, startup costs, and minimum stable outputs of thermal plants, among others. Additionally, the model o ffers the possibility of introducing in the system other dynamic elements such as storage or demand side management, that facilitate renewable integration and reduce the total system cost.

For Sponsors Only

As a benefit to our Associates, the latest Working Papers are embargoed for a period of up to six months before becoming accessible to the public. If you are interested in becoming an Associate or learning more about the benefits of sponsorship, please click here.